From: route@monster.com
Sent: Friday, August 19, 2016 10:43 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Project Coordinator KY
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Matt
Martinez Bowling Green, KY mattamartinez@hotmail.com - (765) 439-0105 FUTURIS AUTOMOTIVE Process
Engineer-Welding Newark,
CA April 2016 - Present Determine
specification of equipment, jigs and tools to achieve the highest efficient
production. Establish
machine size/tonnage, basic tooling size and calculate machine capacity. Establish/Develop
process layout, material consumption and machine capacity. Create
New Model Launch Development target with plants and communicate at
evaluation. Prepare
required documents for development flow evaluation by working closely with
cross-functional groups. Create
improvement ideas to have the most efficient production. Standardize production methods and
management. BOWLING GREEN METAL FORMING-MAGNA Engineering/Maintenance
Leader Bowling
Green, KY November 2015 to February 2016 Manage Business
Unit 5 Engineering Team priorities, project schedules and development process Work
collaboratively with the entire engineering team as well as
cross-functionally within the organization Support work to
develop process improvements and enhancements to maximize production and
quality Communicate with
senior management and other internal customers regularly Communicate with
external customers regularly Manage and develop
program budgets Establish
engineering budgets, manage program within established budgets Track development
against engineering budget template Leads
implementation of engineering standard practices as defined by the New
Product Review process with internal teams to keep projects on time and on
task. Provides oversight
of tooling, process, and document changes associated with the requested
customer changes. Partners with
Program Management in a cross-functional product team environment. Leads design
reviews for new products, tools, processes, and equipment. Reviews designs
for manufacturability and performs risk assessments. Provides technical
support to the Operations Team, through problem solving and Continuous Improvement
methods. GM-Body In White GM-Suspension Nissan-Underbody Process Engineer Bowling Green, KY -
May 2015 to November 2015 Rear Rail Process Engineer/Project Lead –
Body In White TEMA-TOYOTA Powertrain Production
Engineering-Specialist (Contractor) Erlanger, KY - January 2015 to May 2015 440A Cap Up-Highlander/Sienna Bridge
Project (reallocate existing lines to accommodate both Highlander and Sienna
front axle/hub/strut assemblies). 128B/257B minor model change introduction. 760A minor model change introduction. Powertrain Production
Engineering-Specialist (Contractor) Buffalo, WV - June 2014 to January 2015 Lead Production Engineer over Case
Machining. Successful completion of U660 Cap-UP Case
Machining line (9-2014). Body Weld Production Engineering-Specialist
(Contractor)
Erlanger, KY - April 2013 to October 2013 Equipment Vendor Management. New Model equipment procurement,
management, launch. Assist North American Toyota facilities
with equipment installation, set up, auto run….. ThyssenKrupp Bilstein Hamilton, OH -
October 2013 to June 2014 Process/Welding Engineer Equipment procurement (operator, supervisor
training, buyoff). New model launch (PPAP, APQP) Process Improvement (scrap reduction,
downtime reduction, SMED). 26% increase weld department output
(September 2013-present). Fixture/tooling procurement: resulting in
22% increase available department capacity (line balancing). ICON METAL FORMING Corydon, IN -
November 2012 to April 2013 Process/Project Engineer (Contractor) GM 31XX model introduction, APQP, PFMEA,
tooling purchase. Floor space/current weld cell reduction
(standardize weld cell/weld fixture development/full utilization of all
available capacity). $1.4 million reduction in startup costs GM
31XX tooling/capital (standardized weld cell/weld fixture development/full
utilization of all available capacity). SMED/KAIZEN activity lead(weld
fixture/material staging, Operator/Team Leader/Supervisor training). Added die storage: utilize existing
racking/foot print, additional 32 die storage capacity (GM X266 & Ford
C250/14 ton die sets). Standardize weld cell/weld fixture-increase
utilization on capital/lower cost weld fixture/quick changeover/standardize
weld process throughout Martinrea. EBERSPAECHER NORTH AMERICA Northport, AL -
April 2012 to November 2012 Production Manager/Advanced Manufacturing
Engineer Manage production to ensure on-time
delivery/conforming product. Placement/development of Production
Supervisors & Team Leaders. Identify/plan weld cell layout (utilize 3
operators to cycle 4 weld cells/gain 450 minutes uptime per week). Identify & reduce weld rework (80%
reduction F04/F05). Increase Plant OEE 13% (9-20-12 through
11-2-12). $800,000.00 labor cost reduction (9-20-12
through 11-2-12). MBUSI DEHLA model introduction, APQP,
PFMEA, tooling purchase. BMW N47 model introduction, APQP, PFMEA,
tooling purchase. SMED/KAIZEN activity lead, $466,200 annual
savings across 3 shifts (weld fixture/material staging, Operator/Team
Leader/Supervisor training). Added floor space supermarket, warehouse
racking, floor area reduction, added area used for lean supermarket kitting
location. Liaison to customers (Mercedes Benz, BMW,
Volkswagen), North American Headquarters (Novi, MI), South Africa &
corporate headquarters (Neunkirchen, Germany). THE PHOENIX GROUP Greenwood, IN -
July 2011 to April 2012 Project Engineer (Contractor) Alpine JK new model, introduction, process
design/implementation, Manager/Supervisor/Operators training, APQP
lead (Control Plan, FMEA, PPAP, Line Process Audit/Greenwood,
IN/Jeep-Chrysler/9-2011). Charleston turbo charger line move/start up
(Charleston, SC/9-2011). Cummins LF Options & PUMA Filter Head
new model introduction, process design/implementation,
Manager/Supervisor/Operators training, APQP lead (Control Plan, FMEA, PPAP,
Line Process Audit/Rocky Mount, NC/Cummins 1-2012). Alpine FIAT 500 new model, introduction,
process design/implementation, Manager/Supervisor/Operators training, APQP
lead (Control Plan, FMEA, PPAP, Line Process Audit/Greenwood,
IN/Jeep-Chrysler/2-2012). RFQ to production of new model
introduction. Work with component suppliers, tooling
suppliers, Keyence, Atlas Copco, Agilent Technologies, Fields Engineering. Alpine subwoofer sub-assembly error proof,
production, testing. Cummins engine component sub-assembly error
proof, production, testing. Project Manager (Contractor) Greenwood, IN -
August 2010 to September 2010 Project Management of Gas Control Modules
(Cummins FSP/RMEP). Coordinate timing of fixture build,
tooling, programming and line set up. Coordinate current IBC Vendors (Fields
Engineering, Edlo Sales and Engineering, PHX Machine, Integrity Machine. PPAP, Control Plan, Work Instructions, line
installation, training in North Gas Control Module component assembly
process (Cummins RMEP). Gas Control Module tooling/equipment
requirements (Cummins RMEP). Operations Manager Greenwood, IN -
September 2008 to May 2009 Production scheduling of Cummins
sub-assembly production. New model introduction of Cummins
sub-assembly (Evolution Gear Housing, Blackhawk Air Intake Connection, Raptor Air
Intake Connection). New model production quoting (Cummins
Exhaust Manifold, Cummins HPC Assembly, Honda Fuel Canister, Honda
Pressure Sensor Tube, Honda Spacer Tool Box, tooling/process/plant layout). Cummins sub-assembly production line
modification (Cognex DMR-750 handheld scanner, program modification,
tooling/fixture estimation). Cummins sub-assembly production line
"fail safe" modification (Cognex DMR- 750 handheld scanner, Cognex
Vision system inspection, program modification). Core Team: TS16949 Quality System
Implementation. Creation of Control Plans, PFEMA, PPAP,
Work Instructions, for Cummins sub-assemblies and TS16949 Quality System.AVC
Corp. re-kitting production scheduling, operator staffing. Cognex 5100 series vision system set up,
model differentiation via vision system (pattern, part number
identification). MASTERGUARD Veedersburg, IN -
September 2010 to July 2011 Area Manager/Weld Department Manager Promoted to Area Manager, North Plant April
2011 Manage Weld Department, North Stamping
Line, North Assembly, North “ECoat” Line, 156 employees
(engineer/technicians/supervisors/operators). Increase uptime of North Paint Line, remove
non value added travel of operators, raw material floor layout, increase
bar/hour/hoist, increased freedom scheduling at “e-coat” line, remove added
handling of raw/painted material, 18% annual increase. Increase GM drawbar capacity via fixture
modification, increase output via adjacent weld cell downtime, 2000 piece
weekly increase (11% annual increase). Introduction of Nissan stamping line, 51
die set/stamping line launch, first inspection/hourly inspection, work
instructions/SOP, Control Plan/PFMEA/PPAP Weld Department Manager Veedersburg, IN -
September 2010 to April 2011 New Drawbar model introduction (X61F
Nissan). Coordinate contractor/supplier equipment
installation (Centerline, Degensha America, Ahaus Tool and Engineering). Achieve cost savings of $78,000 with
reduction of overtime reduction (November 2010-December 2010). Hire/train Robot Technicians (machine
downtime recovery, weld modification tooling replacement, operator training). PM/TPM development and implementation on
all robotic weld cells. Development/implementation of Production
Control Department between Stamping Department and Weld Department. Implementation of Kanban inventory between
Stamping Department and Weld Department. Achieve consistent weekly piece/price
target. Achieve consistent annual piece/price
target. Implementation of production floor layout
(equipment relocation, floor layout) to achieve $42, 000 annual
logistic/material handling cost savings. HOWA USA Inc Richmond, IN -
February 2007 to September 2008 Supervisor of Manufacturing Engineering Use, ship, and produce world-class product
in our partnership with Honda Motor of America, Toyota, and Nissan. Die Mold modification (MIG/TIG welding
repair and modification, tooling estimation). Robot program adjustment (ABB, Motoman). Plant/production floor layout (MIG/TIG
welding of mobile workstations, tooling fixture estimation). Implementation of Standard Operation
Procedures. 5S/TPM implementation (Roll Coater, Laminator,
Die Mold, Water Jet/robot). New model introduction and trial (die mold
tooling, water jet fixture, water jet/robot cutting program, assembly
fixture/tooling estimation). PM maintenance software purchase and
implementation (Infor EAS Business). Maintenance Technician/Department
development (Robotics training, water jet intensifier training, welding
training). Scrap and all material defect reduction (9%
increase in production). Lean implementation (flow rack material
handling). MRO (maintenance, repair, operations) set
up through Fastenal. Resin and catalyst SPC implementation
(x-bar, upper/lower control limit, adjust limit). Use of ISO 9001 Operating procedures. ROLLS ROYCE Indianapolis, IN -
April 2006 to February 2007 Manufacturing Engineer (Contractor) Root Cause Analysis, Cause and Corrective
Action, scrap reduction. Process improvement and process
verification. Power Gears, Housings and Covers, Prop
Shaft. Successful completion of over 100
concessions to help material flow and scrap reduction. Hommel/Werke Vision Quality Inspection
System implementation, program and training of new optic
inspection/measurement system. Implementation of Manufacturing Operation
Instructions and procedures, Quality Inspection Routings. SUMCO INC Indianapolis, IN -
November 2005 to April 2006 Process Engineer (Contractor) Continual Improvement of Electroplating
Processes. Utilization of Bath Analysis (metal and
acid content) Operator training focused on inputs,
outputs, and interrelation of processes. Reduction of variation, defect prevention,
and waste reduction. KEIHIN IPT Greenfield, IN -
July 2004 to April 2005 Production Coordinator Coordinate production activities in the
Injector Base Machining Department. Use, ship, and produce world-class product
in our partnership with Honda Motor of America. Responsible for Operator Equipment
Efficiency, use of Rotary and Horizontal Milling stations (Makino 4 Axis
Machining). Use of ISO 9001 Operating procedures. Plan-Do-Check-Act methodology in a process
based system to Keep It Simple and Supportable. Set up and dial in of Rotary and Horizontal
Milling centers, effective use of CMM data, for over three month period due
to no Machine Tech. Effective implementation of TPM system on
“Rotary” machining center, full “deep clean” and sustainable TPM schedule. Member of Lean Team open “porosity”
standards to reduce scrap by 26% within the Injector Base machining
department. Turned department around with high
standards after 1 year of no supervision. POLYGUARD-USA FLAP Richmond, IN -
October 2001 to July 2004 Production Supervisor Operate and setup of “hot stamp” hydraulic
presses. Change and setup of dies according to
production schedule/orders. Coordinate with vendor and customer for
proper production schedule capability. Keep precise inventory and purchasing of
mud flaps to ensure the meeting of customer demands. Assist in monthly plant-wide inventory. Reduce set-up/downtime of hydraulic presses
by 40%. Reduction of inventory levels by strong
building of vendor relationship. CONTRACT INDUSTRIAL TOOLING Richmond, IN -
December 1999 to October 2001 Production Supervisor Supervised and coordinated activities in
the paint, final assembly shipping and receiving departments of custom
material handling containers for the automotive industry (MIG welding of
custom material handling containers). Performed final inspection in accordance to
ISO 9001 Operating Procedures. Supervised up to 15-member staff with
responsibility for hiring, training, evaluating, and motivating personnel. Conduct safety meetings and encouraged
continual safety awareness in accordance to ISO 9001 Operating Procedures. CARPENTER MANUFACTURING Richmond, IN -
August 1995 to December 1999 Production Supervisor Supervised and coordinated activities in
the construction of school bus bodies. Responsibility in the floor building
(Teledyne rotary spot welder), main body construction, mating of the floor to
the main body (MIG welding to mate main body and floors), and the
installation of side panels and rub rails. Effectively supervised up to 32 union
employees (UAW). Promoted teamwork and collaboration to
ensure efficiency and work quality. Exceptional hands-on experience with
various welding techniques (MIG, TIG GMAW, Spot, Ultrasonic), multiple machine
operations, and manufacturing methods. Ensured maximum safety of employees with
timely production of quality product. EDUCATION Six Sigma Black Belt training/testing in
Six Sigma Black Belt training/testing Purdue Manufacturing Extension Partnership
- Indianapolis, IN 2009 Six Sigma Green Belt training/testing in
Six Sigma Green Belt training/testing Purdue Manufacturing Extension Partnership
- Indianapolis, IN 2009 BS in Bussiness (concentration in
Accounting/not completed) Indiana University East Richmond - Richmond, IN 2007 to 2009 ABB IRC5 Advanced Robotics Programming ABB
University - Auburn Hills, MI 2008 ABB IRC5 Advanced Robotics Programming ABB
University - Auburn Hills, MI 2008 Motoman NX 100 Basic Robotics Programming
Motoman (2.6 CEU, IACET) - West Carrollton, OH 2007 Motoman NX 100 Maintenance Robotics
Programming Motoman (2.9 CEU, IACET) - West Carrollton, OH 2007 Motoman NX 100 Advanced Robotics
Programming Motoman (2.9 CEU, IACET) - West Carrollton, OH 2007 AS in Industrial Engineering Technology
Purdue School of Technology Richmond - Richmond, IN 2005 SKILLS Engineering, Process Improvement, Stamping,
Machining, Welding, Robotics Programming, Management ADDITIONAL INFORMATION TECHNOLOGY SKILLS Advanced user of Microsoft Office
applications (Word, Excel, Outlook, Power Point, Project) AutoCAD 2000, Solid Edge and Solid Works
computer aided design software. TPM, SPC, Lean Manufacturing, 5s, Root
Cause Analysis, CMM HAZWOPER Hazardous Material Containment Honda Supplier Training (HOST) Legal
Supervision Hommel/Werke Optic Inspection Water Jet cutting program (ABB, Motoman,
ROSEC) MECHANICAL SKILLS Certified forklift operator, various
welding techniques (GMAW, SMAW, TIG, Ultrasonic, Spot, ..), Jigs, Fixtures,
Machining (Horizontal CNC Milling Stations, Rotary Milling Stations, Hobb, KAPP Gear Grinder, Rotary Grinder, Okuma
machining center), Measurement (calipers, micrometers, etc.), Lathes, Mills, Grinders, Press brakes,
Ironworkers, Die setting, Electrostatic paint operations, Weldments, various assembly operations (rivet guns,
screw guns, pneumatic drills,), various cutting techniques (plasma, torch, CNC plasma, metal cutting saws,)
Hommel/Werke Optic Quality Inspection, 6 Axis Robotics Programming (ABB IRC5, Motoman NX 100) |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|